Événements de circulation
855 événements · Page 35 / 43
ModéréConstruction
HWY 400 - Ontario 511
Daily Construction on HWY 400 Northbound between HWY 12 N JCT and PORT SEVERN ROAD, Tay. 1 Alternating Lane(s).
Caméras à proximitéMineurConstruction
Highway 97 - British Columbia 511
Highway 97, southbound. Utility work between Monterey Rd and Collins Rd for 0.9 km (Prince George). Until Sun Sep 13 at 5:00 PM PDT. Lane Closure. Shoulder closed. Last updated Thu Aug 20 at 4:13 PM PDT. (DBC-94023)
Caméras à proximitéMineurConstruction
Other Roads - British Columbia 511
Construction work at Chilliwack Lake Road, 700 metres east of Edward Rd west intersection, for 600 metres. Starting Fri Aug 21 until Sat Oct 31. From 7:00 AM to 5:00 PM PDT, weekdays. Single lane alternating traffic. Watch for traffic control. Last update: August 20th, 2026 at 4:49pm PDT. Work on Aug 21 from 7am-12pm only.
Caméras à proximitéMineurConstruction
Highway 113 - British Columbia 511
Roadside brushing from Highway 113. Starting Thu Aug 20. Watch for traffic control. Last update: August 20th, 2026 at 10:13am PDT.
Caméras à proximitéMineurConstruction
Highway 113 - British Columbia 511
Roadside brushing from Highway 113. Starting Thu Aug 20. Watch for traffic control. Last update: August 20th, 2026 at 10:10am PDT.
Caméras à proximitéMineurConstruction
Westside Road - British Columbia 511
Utility work at Westside Road, 157m Northeast of Westshore Road and Westside Road and 334m South of Pinecrest Road and Westside Road. Starting Mon Aug 24 until Fri Oct 16. From 8:00 AM to 4:00 PM PDT, weekdays. Single lane alternating traffic. Last update: August 21st, 2026 at 3:10pm PDT. No work to occur on the Friday or Monday of a long weekend or on the September stat holiday.
Caméras à proximitéMineurConstruction
Other Roads - British Columbia 511
Utility work from Fulford-Ganges Road, Drake Road to Bittancourt Road. Starting Tue Sep 15 until Thu Sep 17. From 8:00 AM to 5:00 PM PDT, Tuesday to Thursday. Single lane alternating traffic. Watch for traffic control. Last update: August 19th, 2026 at 11:02am PDT.
Caméras à proximitéModéréConstruction
HWY 58A - Ontario 511
Daily Construction on HWY 58A Eastbound between REAKER ROAD and HWY 58/PRINCE CHARLES DRIVE, Welland. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
HWY 58A - Ontario 511
Daily Construction on HWY 58A Westbound between HWY 58/PRINCE CHARLES DRIVE and REAKER ROAD, Welland. 1 Alternating Lane(s).
Caméras à proximitéMineurConstruction
Highway 9 - British Columbia 511
Road construction from Highway 9, In Harrison Hot Springs and Pine Ave to In Harrison Hot Springs and McPherson Rd. Starting Thu Aug 13 until Sun Sep 13. From 8:00 AM to 9:00 PM PDT, Monday to Thursday. Single lane alternating traffic. Last update: August 18th, 2026 at 5:14pm PDT.
Caméras à proximitéMineurConstruction
Highway 7 - British Columbia 511
Utility work from Highway 7, In Pitt Meadows and Pitt River Bridge to In Pitt Meadows and At Meadowtown Centre Way. Starting Mon Sep 14 until Fri Sep 25. From 8:00 PM to 4:00 AM PDT the next day, weekdays. Right lane blocked. Centre lane blocked. Last update: August 18th, 2026 at 1:52pm PDT. Metro Vancouver Regional District is doing utility manhole access for inspection and routine maintenance.
Caméras à proximitéMineurConstruction
Highway 1 - British Columbia 511
Utility work from Highway 1, Deloume Road to Shawnigan Mill Bay Road. Starting Mon Aug 24 until Fri Sep 18. From 9:00 PM to 5:00 AM PDT the next day, weekdays. Closed intermittently. Watch for traffic control. Expect delays. Last update: August 18th, 2026 at 10:49am PDT.
Caméras à proximitéMineurConstruction
Highway 28 - British Columbia 511
Patching at Highway 28. Starting Tue Aug 18. From 10:00 AM to 4:00 PM PDT, Tuesday to Friday. Single lane alternating traffic. Watch for traffic control. Last update: August 18th, 2026 at 9:56am PDT. Single lane alternating for pot patching. Starting at km marker 34.5 on HEADBAY FOREST SERVICE ROAD.
Caméras à proximitéMineurConstruction
Highway 16 - British Columbia 511
Highway 16 (Yellowhead Highway), westbound. Bridge maintenance between Lamco Rd and Goat River East Pit Rd for 2.7 km (27 to 29 km west of McBride). Single lane alternating traffic. Watch for traffic control. Last updated Tue Aug 18 at 8:07 AM PDT. (DBC-93986)
Caméras à proximitéMineurConstruction
Other Roads - British Columbia 511
Road maintenance from Peaceview Road, 4km East of Taylor to 5km East of Taylor. Starting Mon Aug 17 until Wed Sep 30. From 7:00 AM to 5:00 PM MST, weekdays. Single lane alternating traffic. Expect minor delays. Last update: August 17th, 2026 at 2:17pm MST.
Caméras à proximitéMineurConstruction
Other Roads - British Columbia 511
Utility work from Aspen Road, At Aspen Road and Trans-Canada Highway to Highway 1, Malahat Frontage Rd. Starting Mon Aug 31 until Fri Sep 11. From 10:00 PM to 5:00 AM PDT the next day, every day. Right lane blocked. Last update: August 17th, 2026 at 12:40pm PDT.
Caméras à proximitéModéréConstruction
HWY 93 - Ontario 511
Daily Moving Maintenance Closure on HWY 93 Southbound between HWY 12/ANGELA SCHMIDT FOSTER ROAD, Tay and HWY 400, Springwater. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
HWY 93 - Ontario 511
Daily Moving Maintenance Closure on HWY 93 Northbound between HWY 400, Springwater and HWY 12/ANGELA SCHMIDT FOSTER ROAD, Tay. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
HWY 12 - Ontario 511
Daily Moving Maintenance Closure on HWY 12 Southbound between HWY 93/SIMCOE ROAD 93, Midland and HARVEY SETTLEMENT ROAD/FAIRGROUNDS ROAD, Oro Medonte. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
HWY 12 - Ontario 511
Daily Moving Maintenance Closure on HWY 12 Northbound between HARVEY SETTLEMENT ROAD/FAIRGROUNDS ROAD, Oro Medonte and HWY 93/SIMCOE ROAD 93, Midland. 1 Alternating Lane(s).
Caméras à proximité