Événements de circulation
830 événements · Page 33 / 42
MineurConstruction
Highway 16 - British Columbia 511
Highway 16 (Yellowhead Highway), eastbound. Utility work between Holmes River Bridge and Small River Rd and Rest Area for 32.4 km (14 km east of McBride to 15 km west of Tete Jaune). Until Wed Jun 24 at 4:00 PM PDT. Lane Closure. Single lane alternating traffic. Last updated Fri May 15 at 9:20 AM PDT. (DBC-91398)
Caméras à proximitéModéréConstruction
HWY 4 - Ontario 511
Daily Construction on HWY 4 Southbound between Tempo Road and Clinton Line, St Thomas. 1 Right Lane(s).
Caméras à proximitéMineurConstruction
Highway 97 - British Columbia 511
Highway 97 (Cariboo Connector). Utility work between Wright Station Rd and Maze Lake Rd for 7.6 km (33 to 25 km south of 150 Mile House). Until Fri Jun 5. From 8:00 AM to 4:00 PM PDT on weekdays. Single lane alternating traffic. Watch for traffic control. Last updated Fri May 15 at 8:22 AM PDT. (DBC-91395)
Caméras à proximitéMineurConstruction
Highway 1 - British Columbia 511
Highway 1 (TransCanada Highway), westbound. Road construction work between Exit 92 and Exit 87: Clearbrook Rd for 3.7 km (Abbotsford). Until Tue Jun 30 at 7:00 AM PDT. Left lane is closed. Watch for traffic control. Expect delays. Last updated Thu May 14 at 4:01 PM PDT. (DBC-91375)
Caméras à proximitéMajeurConstruction
Highway 99 - British Columbia 511
Highway 99, in both directions. Maintenance at Massey Tunnel (Richmond). Until Sun Jun 7 at 4:00 AM PDT. From 10:00 PM to 4:00 AM PDT on Friday and Saturday. Road closed. Detour in effect. Watch for traffic control. Alternate route via the Alex Fraser Bridge. Next update time Sun Jun 7 at 4:00 AM PDT. Last updated Sun May 31 at 5:23 AM PDT. (DBC-91371)
Caméras à proximitéMineurConstruction
Other Roads - British Columbia 511
Fulford-Ganges Rd, in both directions. Bridge maintenance planned between Isabella Point Rd and Beaver Point Rd. Starting Mon Jun 15 until Fri Jun 19. From 7:00 AM to 5:00 PM PDT daily. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Tue May 19 at 12:48 PM PDT. (DBC-91370)
Caméras à proximitéMajeurConstruction
Highway 4 - British Columbia 511
Highway 4, in both directions. Road construction work between Toquart Bay Rd and Kennedy River Rest Area for 2.5 km (24 to 21 km east of Southern Boundary of Pacific Rim National Park). Until Sat Jun 6 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT daily. Single lane alternating traffic. Expect up to 30 minutes delay. Next update time Sat Jun 6 at 5:00 PM PDT. Last updated Fri May 29 at 11:18 AM PDT. (DBC-91369)
Caméras à proximitéModéréConstruction
HWY 6 - Ontario 511
Daily Construction on HWY 6 Northbound between Rocky Saugeen Road and DOUGLAS STREET (DURHAM SOUTH LIMITS), Rocky Saugeen. 1 Right Lane(s).
Caméras à proximitéModéréConstruction
QEW - Ontario 511
Nightly Construction on QEW Fort Erie Bound On-ramp at DORVAL DRIVE, Oakville. ALL LANES CLOSED.
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Continuous Engineering Investigation on HWY 401 Eastbound Off-ramp at HWY 412, Whitby. 1 Right Lane(s).
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Continuous Engineering Investigation on HWY 401 Eastbound On-ramp at HWY 412, Whitby. 1 Right Lane(s).
Caméras à proximitéMineurConstruction
Highway 10 - British Columbia 511
Highway 10, eastbound. Construction work between 196 St and 200 St for 0.9 km (Surrey to Langley - City). Until Fri Jun 12 at 6:00 AM PDT. Right lane closed. Skytrain project. Last updated Wed May 13 at 11:00 AM PDT. (DBC-91320)
Caméras à proximitéMineurConstruction
Highway 16 - British Columbia 511
Highway 16 (Yellowhead Highway), in both directions. Utility work between Haynes Rd and Finmoore Rd for 0.2 km (11 km west of Bednesti Norman). Until Sat Jun 6 at 5:00 PM PDT. Shoulder closed. Right turn lane closed. Single lane alternating traffic. Last updated Wed May 13 at 9:06 AM PDT. (DBC-91314)
Caméras à proximitéModéréConstruction
HWY 417 - Ontario 511
Continuous Construction on HWY 417 Eastbound between PINECREST AVE / GREENBANK RD (IC 129) and WOODROFFE AVE (IC 127), Ottawa. 1 Left Lane(s).
Caméras à proximitéModéréConstruction
HWY 417 - Ontario 511
Continuous Construction on HWY 417 Westbound between WOODROFFE AVE (IC 127) and PINECREST AVE / GREENBANK RD (IC 129), Ottawa. 3 Right Lane(s).
Caméras à proximitéModéréConstruction
HWY 400 - Ontario 511
Nightly Construction on HWY 400 Southbound On-ramp at DUNLOP STREET / SIMCOE ROAD 90, Barrie. ALL LANES CLOSED.
Caméras à proximitéModéréConstruction
HWY 400 - Ontario 511
Nightly Construction on HWY 400 Southbound Collector Off-ramp at DUNLOP STREET / SIMCOE ROAD 90, Barrie. ALL LANES CLOSED.
Caméras à proximitéModéréConstruction
HWY 400 - Ontario 511
Nightly Construction on HWY 400 Northbound Collector Off-ramp at DUNLOP STREET / SIMCOE ROAD 90, Barrie. ALL LANES CLOSED.
Caméras à proximitéModéréConstruction
HWY 400 - Ontario 511
Nightly Construction on HWY 400 Northbound Collector Off-ramp at DUNLOP STREET / SIMCOE ROAD 90, Barrie. ALL LANES CLOSED.
Caméras à proximitéModéréConstruction
HWY 400 - Ontario 511
Nightly Construction on HWY 400 Northbound On-ramp at DUNLOP STREET / SIMCOE ROAD 90, Barrie. ALL LANES CLOSED.
Caméras à proximité