Événements de circulation
859 événements · Page 37 / 43
ModéréConstruction
HWY 400 - Ontario 511
Nightly Moving Maintenance Closure on HWY 400 Southbound between HWY 11 JCT, Springwater and MAPLEVIEW DRIVE, Barrie. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
HWY 400 - Ontario 511
Nightly Moving Maintenance Closure on HWY 400 Northbound between MAPLEVIEW DRIVE, Barrie and HWY 11 JCT, Springwater. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
HWY 400 - Ontario 511
Nightly Moving Maintenance Closure on HWY 400 Southbound between MAPLEVIEW DRIVE, Barrie and CANAL RD., Bradford. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
HWY 400 - Ontario 511
Nightly Moving Maintenance Closure on HWY 400 Northbound between CANAL RD., Bradford and MAPLEVIEW DRIVE, Barrie. 1 Alternating Lane(s).
Caméras à proximitéMineurConstruction
Highway 19 - British Columbia 511
Paving operations from Highway 19, In Nanaimo and Highway 1 and Highway 19 Interchange to In Nanaimo and Duke Point Ferry Terminal. Starting Tue Aug 18 until Sat Sep 12. From 8:00 PM to 6:00 AM PDT the next day, weekdays and Sunday. Watch for traffic control. Last update: August 17th, 2026 at 8:11am PDT. Exit and entrance ramps will be closed periodically.
Caméras à proximitéMineurConstruction
Highway 1 - British Columbia 511
Electrical maintenance from Highway 1, In Vancouver and Cassiar Tunnel to In Vancouver. Starting Tue Sep 8 until Fri Sep 18. From 9:00 PM to 4:00 AM PDT the next day, Monday to Thursday and Sunday. Left lane closed. Watch for traffic control. Last update: August 20th, 2026 at 8:24am PDT.
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Daily Construction on HWY 401 Eastbound between Gracey Side Road and Gracey Side Road, Windsor. 1 Left Lane(s).
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Nightly Construction on HWY 401 Westbound between DICKINSON RD (IC 770)/CR 14 and DICKINSON RD (IC 770)/CR 14, Ingleside. 1 Right Lane(s).
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Nightly Construction on HWY 401 Eastbound between DICKINSON RD (IC 770)/CR 14 and DICKINSON RD (IC 770)/CR 14, Ingleside. 1 Right Lane(s).
Caméras à proximitéMineurConstruction
Highway 19 - British Columbia 511
Bridge maintenance from Highway 19 to In Cumberland. Starting Thu Sep 17 until Sun Sep 20. Expect delays. Watch for traffic control. Last update: August 13th, 2026 at 4:54pm PDT.
Caméras à proximitéMineurConstruction
Highway 97A - British Columbia 511
Bridge maintenance at Highway 97A. Starting Mon Aug 17. From 8:00 AM to 3:00 PM PDT, Monday to Thursday. Single lane alternating traffic. Expect minor delays. Last update: August 13th, 2026 at 10:31am PDT. Bridge Deck Repair.
Caméras à proximitéMineurConstruction
Highway 19A - British Columbia 511
Road maintenance. Starting Mon Sep 14 until Mon Sep 21. Watch for traffic control. Watch for rock debris when travelling over the Trent River bridge until August 21, 2026.
Caméras à proximitéMineurConstruction
Highway 28 - British Columbia 511
Bridge construction. Starting Sun Sep 13 until Mon Sep 21. Expect delays. Watch for traffic control. Watch for rock debris when travelling over the Buttle Narrows Bridge until August 21, 2026.
Caméras à proximitéMineurConstruction
Airport Way - British Columbia 511
Special event. Starting Sat Sep 19 until Sat Sep 19. From 8:00 AM to 4:30 PM PDT, Saturday. Watch for traffic control and RCMP enforcement due to the Revelstoke Gran Fondo.
Caméras à proximitéMajeurIncident
Other Roads - British Columbia 511
Princeton Summerland Rd. There is a wildfire between Trout Creek Main and Summerland 45 km north of Princeton. Road closed. Watch for traffic control. Alternate Routes: Highway 5A and Highway 3. Next update time Fri Sep 11 at 9:00 AM PDT. Last updated Wed Sep 9 at 1:00 PM PDT. (DBC-93947)
Caméras à proximitéMineurConstruction
Highway 3 - British Columbia 511
Paving operations. Starting Mon Aug 10 until Tue Sep 29. From 7:00 AM to 7:00 PM MST, Monday to Saturday. Single lane alternating traffic. Watch for traffic control. Expect delays.
Caméras à proximitéModéréConstruction
QEW - Ontario 511
Continuous Construction on QEW Toronto bound between NETHERBY ROAD, Fort Erie and WELLAND RIVER BRIDGE, Niagara Falls. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
QEW - Ontario 511
Continuous Construction on QEW Fort Erie Bound between WELLAND RIVER BRIDGE, Niagara Falls and NETHERBY ROAD, Fort Erie. 1 Alternating Lane(s).
Caméras à proximitéMineurConstruction
Other Roads - British Columbia 511
Utility work. Starting Tue Sep 8 until Fri Oct 30. Single lane alternating traffic. Expect minor delays. Watch for traffic control. Slow down and watch for work crews.
Caméras à proximitéMineurConstruction
Highway 3B - British Columbia 511
Utility work. Starting Wed Aug 12 until Fri Oct 30. From 7:00 AM to 5:00 PM PDT, weekdays. Right lane blocked. Shoulder closed. 50km/h construction speed zone in effect 24/7. Storm main being replaced in the ditch. Eastbound left turns will be restricted for Phase II of the project.
Caméras à proximité