Traffic Events
743 events · Page 35 / 38
ModerateConstruction
QEW - Ontario 511
Continuous Construction on QEW Toronto bound On-ramp at DORVAL DRIVE, Oakville. ALL LANES CLOSED.
Nearby CamerasModerateConstruction
HWY 417 - Ontario 511
Daily Construction on HWY 417 Eastbound between INNES RD (IC 112), Ottawa and ONTARIO/QUEBEC BDY, Qb Border. 1 Left Lane(s).
Nearby CamerasMinorConstruction
Highway 97 - British Columbia 511
Highway 97 (Alaska Highway). Bridge construction between Sikanni Chief Rd and Prophet River Sub Rd (94 km south of Fort Nelson). Until Sat Oct 31. Single lane alternating traffic. Bridge construction at the Bougie Bridge south of Prophet River. Width restriction to 3.8 meters, Height restriction to 5.33 meters, Length restriction to 27.5m. GVW 81,500 kg. Last updated Mon Jun 1 at 7:17 AM MST. (DBC-92059)
Nearby CamerasMinorConstruction
Highway 97 - British Columbia 511
Highway 97 (Alaska Highway), in both directions. Bridge construction between Pink Mountain Rd and Suicide Hill Pullout (67 km north of Wonowon). Until Sat Oct 31. Single lane alternating traffic. Beatton Bridge Construction, just north of Pink Mountain Road. Width restriction to 3.8 meters, Height restriction to 5.33 meters, Length restriction to 27.5m. GVW 81,500 kg. Last updated Mon Jun 1 at 7:17 AM MST. (DBC-92057)
Nearby CamerasMinorConstruction
Nisga'a Hwy - British Columbia 511
Nisga'a Hwy (Highway 113), in both directions. Road construction work between Dump Rd and Red Bluff (8 km east of Gingolx). From 7:00 AM to 5:00 PM PDT on weekdays. Single lane alternating traffic. Expect minor delays. Last updated Mon Jun 1 at 5:36 AM PDT. (DBC-91992)
Nearby CamerasMinorConstruction
Highway 5 - British Columbia 511
[Truncated] Highway 5 (Coquihalla South), in both directions. Construction work between Exit 202: Portia and Exit 217: Zopkios Brake Check for 3.2 km (3 km south of Coquihalla Summit to 1 km north of Great Bear Snowshed). Left lane is closed in both directions. 24/7 construction. Speed reductions in place. Please obey signage, slow down and watch for roadside workers. Expect delays and higher traffic volume due to Hwy 1/Hwy 3 wildfire activity. Next update time Wed Jul 29 at 12:00 PM PDT. Last u
Nearby CamerasModerateConstruction
HWY 594 - Ontario 511
Daily Construction on HWY 594 Westbound between CASIMER AVE and EARL AVE, Dryden. ALL LANES CLOSED.
Nearby CamerasModerateConstruction
HWY 17 - Ontario 511
Daily Maintenance on HWY 17 Eastbound between MACGREGOR RD (W) and MACGREGOR RD (W), Thunder Bay. 1 Right Lane(s).
Nearby CamerasMinorConstruction
Highway 8 - British Columbia 511
Highway 8. Construction work between the start of Highway 8 and 14 Mile Ranch Rd for 2.6 km (9 to 11 km east of Spences Bridge). Until Fri Jul 31. SITE 9/10. Single lane alternating traffic with up to 30 minute delays between 10am-2pm. Last updated Mon Jun 29 at 12:38 PM PDT. (DBC-91791)
Nearby CamerasModerateConstruction
HWY 21 - Ontario 511
Daily Construction on HWY 21 Northbound between Laurier Line (East Side) [ near Amberley ] and Maypark Road [ near Amberley ], Amberley. 1 Left Lane(s).
Nearby CamerasMinorIncident
Highway 1 - British Columbia 511
Highway 1 (TransCanada Highway), in both directions. Watch for falling rocks between Old Ferry Rd and Des Fosses Rd for 43.7 km (7 km east of Kamloops to 14 km east of Chase). Last updated Sat Jul 25 at 3:59 PM PDT. (DBC-91607)
Nearby CamerasModerateConstruction
HWY 21 - Ontario 511
Daily Construction on HWY 21 Northbound between Laurier Line (West Side) [ near Amberley ] and Maypark Road [ near Amberley ], Amberley. 1 Left Lane(s).
Nearby CamerasModerateConstruction
HWY 4 - Ontario 511
Daily Construction on HWY 4 Southbound between Tempo Road and Clinton Line, St Thomas. 1 Right Lane(s).
Nearby CamerasModerateConstruction
HWY 417 - Ontario 511
Continuous Construction on HWY 417 Eastbound between PINECREST AVE / GREENBANK RD (IC 129) and WOODROFFE AVE (IC 127), Ottawa. 1 Left Lane(s).
Nearby CamerasModerateConstruction
HWY 417 - Ontario 511
Continuous Construction on HWY 417 Westbound between WOODROFFE AVE (IC 127) and PINECREST AVE / GREENBANK RD (IC 129), Ottawa. 3 Right Lane(s).
Nearby CamerasMinorConstruction
Other Roads - British Columbia 511
Ridley Island Road, in both directions. Construction work between Highway 16 and Ridley Terminal near Prince Rupert. Until Fri Oct 30 at 8:00 PM PDT. Watch for traffic control. Construction for two access roads from South Kaien Upper Bench Lands Development to the Ridley Island Access Road. Last updated Tue Jun 16 at 8:32 AM PDT. (DBC-91199)
Nearby CamerasModerateConstruction
HWY 401 - Ontario 511
Daily Construction on HWY 401 Eastbound On-ramp at Highway 4 / Colonel Talbot Rd, London. ALL LANES CLOSED.
Nearby CamerasMajorIncident
Other Roads - British Columbia 511
Little Lake Quesnel River Road. Washout at West of Likely Road Turnoff near Williams Lake. Road closed. Road closed 10 km West of Likely Road Turnoff. No detour. No homes or driveways affected. No access to Quesnel River. Next update time Tue Sep 1 at 11:00 AM PDT. Last updated Wed Jun 3 at 12:29 PM PDT. (DBC-90684)
Nearby CamerasMinorConstruction
Highway 97 - British Columbia 511
Highway 97 (Cariboo Connector), in both directions. Road maintenance work between Hush Lake Rd and Olson Rd for 9.0 km (24 km south of Hixon to 20 km north of Quesnel). Single lane alternating traffic. Expect delays. Reduce speed, watch for crews at work. Last updated Fri May 1 at 11:06 AM PDT. (DBC-90680)
Nearby CamerasMajorConstruction
Highway 5 - British Columbia 511
[Truncated] Highway 5 (Coquihalla North), in both directions. Bridge construction between Exit 286: Merritt - 97C and Exit 290: Merritt for 4.1 km (Merritt). Until Sat Oct 31. 1 lane open in each direction at all times. Counterflow lane in effect 10am-6pm northbound from Fri-Sat, southbound on Sun. Northbound wide loads restricted to 3.8m while counterflow in effect. Wide loads otherwise restricted to 5m. Speed to 50km/h. Watch for signage and traffic control. Next update time Sat Aug 15 at 12:0
Nearby Cameras