logo OpenRoadCam Canada

Traffic Events

Reset

741 events  ·  Page 34 / 38

MinorConstruction

Highway 5 - British Columbia 511

Highway 5, in both directions. Roadside brushing between Chappell Creek Rec Site and Whiskeyfill Rd for 50.4 km (5 km south of Valemount to 30 km north of Blue River). Until Mon Aug 31 at 6:00 PM PDT. Shoulder closed. Watch for traffic control. Last updated Thu Jun 18 at 8:21 AM PDT. (DBC-92993)

Updated: 2026-06-18T15:21:32Z
Created: 2026-06-18T15:21:32Z
Nearby Cameras
MinorConstruction

Highway 39 - British Columbia 511

Highway 39, northbound. Utility work between Skeena Dr and Centennial Dr for 0.4 km (Mackenzie). Until Wed Jul 29 at 4:00 PM PDT. Shoulder closed. Last updated Wed Jun 17 at 4:03 PM PDT. (DBC-92958)

Updated: 2026-07-22T16:00:00Z
Created: 2026-06-17T23:03:51Z
Nearby Cameras
ModerateConstruction

HWY 21 - Ontario 511

Daily Construction on HWY 21 Northbound between Sideroad 5, Allenford and County Road 10 North / Grey Bruce Line, Jackson. 1 Left Lane(s).

Updated: 2026-06-17T20:57:00Z
Created: 2026-06-17T20:57:00Z
Nearby Cameras
MinorConstruction

Highway 16 - British Columbia 511

Highway 16 (Yellowhead Highway). Bridge construction planned between Penny Access Rd and Dome Creek Camp (51 km east of Purden Lake). Starting Mon Jul 27 at 8:00 AM PDT until Fri Oct 2 at 6:00 PM PDT. Single lane alternating traffic will be in effect. Expect delays. Max vehicle width 4.4m. Max load width 6.1 m. Min load ground clearance 0.5 m. Last updated Fri Jul 24 at 2:07 PM PDT. (DBC-92893)

Updated: 2026-07-24T21:07:22Z
Created: 2026-06-16T23:19:21Z
Nearby Cameras
ModerateConstruction

HWY 8 - Ontario 511

Daily Construction on HWY 8 Westbound between Suncoast Drive and Cambria Road, Goderich. 1 Right Lane(s).

Updated: 2026-06-16T16:58:00Z
Created: 2026-06-16T16:58:00Z
Nearby Cameras
MinorConstruction

Highway 16 - British Columbia 511

Highway 16 (Yellowhead Highway), westbound. Maintenance between Hargreaves Rd and Rearguard Falls Access for 12.1 km (4 to 16 km east of Tete Jaune). Until Tue Sep 15 at 7:00 PM PDT. Lane Closure. Shoulder closed. Watch for traffic control. Last updated Thu Jun 18 at 7:01 AM PDT. (DBC-92807)

Updated: 2026-06-30T14:00:00Z
Created: 2026-06-15T18:02:44Z
Nearby Cameras
ModerateConstruction

HWY 401 - Ontario 511

Daily Construction on HWY 401 Eastbound On-ramp at Highway 4 / Colonel Talbot Rd, London. ALL LANES CLOSED.

Updated: 2026-06-12T19:08:00Z
Created: 2026-06-12T19:08:00Z
Nearby Cameras
ModerateConstruction

HWY 4 - Ontario 511

Daily Construction on HWY 4 Northbound between Orr Drive and Orr Drive, St Thomas. 1 Left Lane(s).

Updated: 2026-06-12T19:03:00Z
Created: 2026-06-12T19:03:00Z
Nearby Cameras
MinorConstruction

Highway 5 - British Columbia 511

[Truncated] Highway 5 (Coquihalla South), in both directions. Construction work between Exit 250: Larson Hill and Exit 256: Coldwater Rd for 6.8 km (31 km north of Coquihalla Summit to 29 km south of Merritt). Left lane is closed in both directions. 24/7 construction. Speed reductions in place. Please obey signage, slow down and watch for roadside workers. Expect delays and higher traffic volume due to Highway 1/Highway 3 wildfire activity. Next update time Fri Jul 31 at 12:00 PM PDT. Last updat

Updated: 2026-07-25T01:07:04Z
Created: 2026-06-12T19:02:18Z
Nearby Cameras
MinorConstruction

Other Roads - British Columbia 511

Westsyde Rd, in both directions. Bridge construction between Clark Rd and Jamieson Creek FSR near Kamloops. Until Fri Aug 7 at 6:00 PM PDT. From 6:00 PM to 6:00 PM PDT daily. Detour in effect. Single lane alternating traffic. Expect minor delays. In effect 24 hours a day Bridge replacement. Detour in effect over temporary bridge. Watch for crew and equipment working.
Maximum height clearance 4.8 meters Through Detour only. Last updated Fri Jul 24 at 2:56 PM PDT. (DBC-92707)

Updated: 2026-07-24T21:56:30Z
Created: 2026-06-12T16:33:14Z
Nearby Cameras
MinorConstruction

Highway 5 - British Columbia 511

Highway 5, in both directions. Bridge construction at Six Mile/HWY 5 Bridge (10 km south of Blue River). Until Fri Oct 30. Single lane alternating traffic. Watch for traffic control. Lane width reduction to 3.8 m wide lane, with a max 4.4m width including overhang. In addition, a maximum weight, restriction of 85T with the requirement of 1 truck on the bridge deck at a time is in effect. Last updated Thu Jul 9 at 2:45 PM PDT. (DBC-92573)

Updated: 2026-07-09T21:45:58Z
Created: 2026-06-10T01:52:12Z
Nearby Cameras
MinorConstruction

Other Roads - British Columbia 511

Lillooet - Pioneer Rd 40. Bridge maintenance at Tyaughton Creek Bridge. Until Wed Sep 30. Single lane alternating traffic. Watch for traffic control. Maximum clearance width 3.18 m (10.4 ft). Oversized loads wider than 3.18 m use alternate route. Expect minor delays of up to 10 minutes. Last updated Wed Jun 24 at 2:20 PM PDT. (DBC-92481)

Updated: 2026-06-24T21:20:54Z
Created: 2026-06-08T17:45:58Z
Nearby Cameras
MinorConstruction

Highway 16 - British Columbia 511

Highway 16 (Yellowhead Highway), in both directions. Pothole repair between Suskwa Forest Service Rd and Station Rd W for 1.8 km (Witset (Moricetown) to 2 km west of Witset (Moricetown)). From 7:00 AM to 4:30 PM PDT on Monday, Tuesday, Wednesday and Thursday. Single lane alternating traffic. Expect minor delays. Watch for crew and equipment. Use caution and slow speed when passing. Last updated Mon Jun 29 at 1:03 PM PDT. (DBC-92447)

Updated: 2026-06-29T20:03:53Z
Created: 2026-06-08T14:10:50Z
Nearby Cameras
ModerateConstruction

HWY 401 - Ontario 511

Continuous Construction on HWY 401 Eastbound between Gracey Side Road and Gracey Side Road, Windsor. 1 Left Lane(s).

Updated: 2026-06-05T19:18:00Z
Created: 2026-06-05T19:18:00Z
Nearby Cameras
ModerateConstruction

HWY 401 - Ontario 511

Daily Construction on HWY 401 Eastbound between Highway 4 / Colonel Talbot Rd and Highway 4 / Colonel Talbot Rd, London. 1 Alternating Lane(s).

Updated: 2026-06-05T16:04:00Z
Created: 2026-06-05T16:04:00Z
Nearby Cameras
MinorConstruction

Other Roads - British Columbia 511

Kispiox Valley Rd, in both directions. Bridge construction at Kispiox River Lodge near New Hazelton. Until Mon Sep 7. Single lane alternating traffic. Watch for traffic control. Expect minor delays. Work will be taking place 24/7. Watch for crews and expect delays. Last updated Sat Jul 11 at 11:46 AM PDT. (DBC-92361)

Updated: 2026-07-11T18:46:00Z
Created: 2026-06-04T19:03:29Z
Nearby Cameras
ModerateConstruction

HWY 11 - Ontario 511

Daily Construction on HWY 11 Southbound between CLEAR LAKE RD, Kapuskasing and FAUQUIER/STRICKLAND TREMBLAY AV, Fauquier. 1 Alternating Lane(s).

Updated: 2026-06-03T21:38:00Z
Created: 2026-06-03T21:38:00Z
Nearby Cameras
MinorConstruction

Nisga'a Highway - British Columbia 511

Nisga'a Highway. Paving operations between Big Cedar River Bridge and Sand Gainor Bridge near Terrace. Until Fri Jul 31. From 6:30 AM to 8:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Expect delays of up to 20 minutes. Last updated Wed Jul 8 at 10:20 AM PDT. (DBC-92229)

Updated: 2026-07-10T07:00:00Z
Created: 2026-06-02T18:55:03Z
Nearby Cameras
ModerateConstruction

QEW - Ontario 511

Continuous Construction on QEW Toronto bound On-ramp at DORVAL DRIVE, Oakville. ALL LANES CLOSED.

Updated: 2026-06-01T20:58:00Z
Created: 2026-06-01T20:58:00Z
Nearby Cameras
ModerateConstruction

HWY 417 - Ontario 511

Daily Construction on HWY 417 Eastbound between INNES RD (IC 112), Ottawa and ONTARIO/QUEBEC BDY, Qb Border. 1 Left Lane(s).

Updated: 2026-05-30T01:02:00Z
Created: 2026-05-30T01:02:00Z
Nearby Cameras