Événements de circulation
860 événements · Page 43 / 43
ModéréConstruction
HWY 21 - Ontario 511
Daily Construction on HWY 21 Northbound between Laurier Line (West Side) [ near Amberley ] and Maypark Road [ near Amberley ], Amberley. 1 Left Lane(s).
Caméras à proximitéModéréConstruction
HWY 4 - Ontario 511
Daily Construction on HWY 4 Southbound between Tempo Road and Clinton Line, St Thomas. 1 Right Lane(s).
Caméras à proximitéMineurConstruction
Other Roads - British Columbia 511
Ridley Island Road, in both directions. Construction work between Highway 16 and Ridley Terminal near Prince Rupert. Until Fri Oct 30 at 8:00 PM PDT. Watch for traffic control. Construction for two access roads from South Kaien Upper Bench Lands Development to the Ridley Island Access Road. Last updated Tue Jun 16 at 8:32 AM PDT. (DBC-91199)
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Daily Construction on HWY 401 Eastbound On-ramp at Highway 4 / Colonel Talbot Rd, London. ALL LANES CLOSED.
Caméras à proximitéModéréConstruction
QEW - Ontario 511
Continuous Construction on QEW Fort Erie Bound between CONCESSION ROAD and CENTRAL AVENUE, Fort Erie. 2 Alternating Lane(s).
Caméras à proximitéMineurConstruction
Highway 97 - British Columbia 511
Highway 97 (Alaska Highway), in both directions. Road sweeping between 259 Rd and Julia Frtg for 18.3 km (Fort St John). From 12:00 AM to 12:00 AM MST on weekdays and Saturday. Continuous slow moving vehicle. Watch for crew and equipment working. Last updated Tue Apr 21 at 9:42 AM MST. (DBC-90237)
Caméras à proximitéModéréConstruction
HWY 7A - Ontario 511
Daily Construction on HWY 7A Eastbound between N Jct Of Hwy 35/Twigg Rd, Nestleton and BEERS RD, Bethany. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
HWY 35 - Ontario 511
Daily Construction on HWY 35 Northbound between BOUNDARY RD and TELECOM RD, Pontypool. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
HWY 417 - Ontario 511
Daily Construction on HWY 417 Westbound Off-ramp at RICHMOND RD (IC 130)/BAYSHORE DR, Ottawa. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
QEW - Ontario 511
Continuous Construction on QEW Toronto bound between PEACE BRIDGE and CONCESSION ROAD, Fort Erie. 3 Alternating Lane(s).
Caméras à proximitéModéréConstruction
QEW - Ontario 511
Continuous Construction on QEW Toronto bound between CONCESSION ROAD and GILMORE ROAD, Fort Erie. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
QEW - Ontario 511
Continuous Construction on QEW Fort Erie Bound between RIDGEMOUNT ROAD and CONCESSION ROAD, Fort Erie. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Continuous Construction on HWY 401 Westbound Off-ramp at Highway 4 / Colonel Talbot Rd, London. ALL LANES CLOSED.
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Continuous Construction on HWY 401 Westbound On-ramp at Highway 4 / Colonel Talbot Rd, London. ALL LANES CLOSED.
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Continuous Construction on HWY 401 Eastbound Off-ramp at Highway 4 / Colonel Talbot Rd, London. ALL LANES CLOSED.
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Continuous Construction on HWY 401 Eastbound On-ramp at Highway 4 / Colonel Talbot Rd, London. ALL LANES CLOSED.
Caméras à proximitéModéréConstruction
HWY 3 - Ontario 511
Daily Construction on HWY 3 Eastbound between Ron McNeil Line / Ford Road and Ron McNeil Line / Ford Road, Talbotville. 1 Right Lane(s).
Caméras à proximitéMineurConstruction
Highway 5 - British Columbia 511
Highway 5, southbound. Construction work between Miledge Creek Bridge and Thunder River Rd for 4.9 km (17 to 12 km north of Blue River). Until Sat Nov 7 at 5:00 PM PST. From 8:00 AM to 5:00 PM PST on weekdays. Watch for traffic control. Single Lane Alternating Traffic will only be required for a brief duration during mobilization and demobilization of materials and equipment. Last updated Mon Jan 26 at 10:10 AM PST. (DBC-82106)
Caméras à proximitéMineurConstruction
Other Roads - British Columbia 511
Germansen Landing Road, northbound. Geotechnical investigation between 1.5KM and 2.5KM near Fort St James. Road closed. Closed at the 1.7 kilometre mark. Detour in Effect using the Takla Road to Teardrop Forest Service Road. Next update time Fri Jan 1, 2027 at 4:30 PM PDT. Last updated Fri May 29 at 9:54 AM PDT. (DBC-81520)
Caméras à proximitéMineurConstruction
Other Roads - British Columbia 511
Old Alaska Highway, in both directions. Geotechnical investigation at Kiskatinaw Curved Bridge near Dawson Creek. Bridge is closed. Assessment in progress. Slide impacting bridge. Next update time Thu Nov 5 at 10:00 AM MST. Last updated Tue May 5 at 10:11 AM MST. (DBC-30093)
Caméras à proximité