Événements de circulation
758 événements · Page 23 / 38
ModéréConstruction
HWY 400 - Ontario 511
Nightly Construction on HWY 400 Northbound between HWY 9, Kettleby and 5TH LINE, Bradford. 2 Alternating Lane(s).
Caméras à proximitéMineurConstruction
Other Roads - British Columbia 511
Mountain Highway, southbound. Construction work between Oxford st and Main st in North Vancouver - District. Until Thu Jun 11. From 7:00 PM to 5:00 AM PDT daily. Centre lane blocked. Left turn lane closed. Watch for traffic control. Expect delays. Last updated Wed May 27 at 6:07 PM PDT. (DBC-91942)
Caméras à proximitéMineurConstruction
Highway 17 - British Columbia 511
Highway 17, in both directions. Utility work planned between Highway 91 Connector and Tannery Rd for 6.9 km (Delta to Surrey). Starting Mon Jun 8 at 9:00 AM PDT until Mon Jun 8 at 1:00 PM PDT. Right lane will be closed. Watch for traffic control personnel. Survey work. Crews will be working eastbound for 2 hours in the morning, and alternating to westbound for another 2 hours afterwards. Last updated Wed May 27 at 7:16 PM PDT. (DBC-91940)
Caméras à proximitéMineurConstruction
Highway 1 - British Columbia 511
Highway 1 (TransCanada Highway), eastbound. Road construction work planned between Exit 18: Lonsdale Ave and Exit 19: Lynn Valley Rd for 0.1 km (North Vancouver - City). Starting Mon Jun 8 at 7:00 AM PDT until Fri Jun 19 at 5:00 PM PDT. From 7:00 AM to 5:00 PM PDT on weekdays. Right turn lane will be closed. Expect delays. Watch for traffic control personnel. From Lonsdale Ave to St Georges Ave. Last updated Wed May 27 at 3:49 PM PDT. (DBC-91938)
Caméras à proximitéMineurConstruction
Highway 7 - British Columbia 511
Highway 7 (Lougheed Highway), westbound. Utility work planned between Beach Camp Rd and Brooks Rd for 10.6 km (1 to 12 km west of Kent). Starting Mon Jun 8 at 9:30 AM PDT until Fri Jun 19 at 3:00 PM PDT. From 9:30 AM to 3:00 PM PDT on weekdays. Single lane alternating traffic will be in effect. Watch for traffic control personnel. Last updated Mon Jun 1 at 3:18 PM PDT. (DBC-91935)
Caméras à proximitéModéréConstruction
HWY 400 - Ontario 511
Nightly Construction on HWY 400 Northbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 2 Left Lane(s).
Caméras à proximitéModéréConstruction
HWY 404 - Ontario 511
Nightly Maintenance on HWY 404 Southbound between WOODBINE AVE, Gwillimbury and YORK MILLS ROAD, Toronto. 1 Alternating Lane(s).
Caméras à proximitéModéréConstruction
HWY 400 - Ontario 511
Nightly Construction on HWY 400 Southbound between INNISFIL BEACH RD - SIMCOE ROAD 21 and INNISFIL BEACH RD - SIMCOE ROAD 21, Innisfil. 2 Left Lane(s).
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Nightly Construction on HWY 401 Eastbound between CAMDEN EAST RD (IC 593)/CR 4 and CAMDEN EAST RD (IC 593)/CR 4, Odessa. 1 Left Lane(s).
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Nightly Construction on HWY 401 Westbound between WILTON RD (IC 599)/CR 6 and WILTON RD (IC 599)/CR 6, Odessa. 1 Left Lane(s).
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Nightly Construction on HWY 401 Eastbound between WILTON RD (IC 599)/CR 6 and WILTON RD (IC 599)/CR 6, Odessa. 1 Left Lane(s).
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Nightly Construction on HWY 401 Westbound between Switzerville Rd and Switzerville Rd, Napanee. 1 Left Lane(s).
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Nightly Construction on HWY 401 Eastbound between Switzerville Rd and Switzerville Rd, Napanee. 1 Left Lane(s).
Caméras à proximitéModéréConstruction
HWY 401 - Ontario 511
Nightly Construction on HWY 401 Westbound between CAMDEN EAST RD (IC 593)/CR 4 and CAMDEN EAST RD (IC 593)/CR 4, Odessa. 1 Left Lane(s).
Caméras à proximitéMineurConstruction
Highway 10 - British Columbia 511
Highway 10, in both directions. Paving operations between Junction Hwy 91 and 232 St for 25.3 km (Langley - District to Delta). Until Sat Jun 13. From 8:00 PM to 6:00 AM PDT daily. Right turn lane closed. Asphalt milling and paving for the 2026 City of Surrey MRN Paving Program. Last updated Wed May 27 at 1:12 PM PDT. (DBC-91929)
Caméras à proximitéMineurConstruction
Highway 7B - British Columbia 511
Highway 7B (Mary Hill Bypass), eastbound. Construction work at Broadway St (Port Coquitlam). Until Mon Jun 15. Right lane closed. Bus Stop improvements at Highway 7B and Broadway. Lane closure on May 29th at 8pm to June 1st at 2pm; June 5th at 8pm to June 8th at 2pm and June 12th from 8pm to June 15th at 2pm. Last updated Wed May 27 at 12:32 PM PDT. (DBC-91928)
Caméras à proximitéMineurConstruction
Highway 1 - British Columbia 511
Highway 1 (TransCanada Highway), in both directions. Paving operations between Kanaka Station Rd and Gladwin Rd for 20.8 km (4 km north of Jackass Mountain Summit to 5 km east of Lytton). Until Sat Jun 13 at 7:00 PM PDT. From 7:00 AM to 7:00 PM PDT on weekdays and Saturday. Single lane alternating traffic. Watch for traffic control. Last updated Wed May 27 at 12:22 PM PDT. (DBC-91924)
Caméras à proximitéModéréConstruction
HWY 148 - Ontario 511
Nightly Construction on HWY 148 Eastbound between ANGUS CAMPBELL DR and RENFREW CR 40/GREENWOOD RD, Pembroke. 1 Right Lane(s).
Caméras à proximitéMineurConstruction
Highway 19A - British Columbia 511
Highway 19A (Island Highway), in both directions. Utility work planned between Stanhope Rd and Wright Rd for 0.1 km (Parksville). Starting Wed Jun 10 at 9:30 AM PDT until Wed Jun 10 at 2:30 PM PDT. Single lane alternating traffic will be in effect. Expect minor delays. Watch for traffic control personnel. Slow down and watch for work crews. Last updated Wed May 27 at 8:28 AM PDT. (DBC-91905)
Caméras à proximitéModéréConstruction
HWY 10 - Ontario 511
Nightly Construction on HWY 10 Southbound between FORKS OF THE CREDIT ROAD and OLD SCHOOL ROAD, Caledon. 1 Alternating Lane(s).
Caméras à proximité